[1] 贺俊杰,张洁,张朋,等.基于多智能体强化学习的纺织面料染色车间动态调度方法[J].计算机集成制造系统.2021,1-31. [2] Zheng Peng, Zhang Peng, Wang Junliang, et al. A data-driven robust optimization method for the assembly job-shop scheduling problem under uncertainty[J]. International Journal of Computer Integrated Manufacturing. 2020:1-16. [3] Zhou Yaqin, Wang Junliang, Zhang Peng, et al. Research on dyeing workshop scheduling methods for knitted fabric production based on a multi-objective hybrid genetic algorithm[J]. Measurement and Control. 2020, 53(7-8): 1529-1539. [4] 蒋小康,张朋,吕佑龙,等.基于混合蚁群算法的半导体生产线炉管区调度方法[J].上海交通大学学报.2020,54(08):792-804. [5] 张洁,赵新明,张朋, 等.面向火箭总装过程的工期延误预警方法[J].上海交通大学学报.2020,54(03):322-330. [6] 张洁, 张朋. 晶圆制造中的并行机调度[M]. 清华大学出版社, 2019. [7] 张洁,盛夏,张朋,等. 面向制造过程数据的两阶段无监督特征选择方法[J].机械工程学报.2019,55(17):133-144. [8] 盛夏,赵新明,张朋,等. 基于栈式自动编码器的火箭总装完工时间预测[J].计算机集成制造系统.2019,25(11):2720-2730. [9] Zhang Peng, Lv Youlong, Zhang Jie. An improved imperialist competitive algorithm based photolithography machines scheduling[J]. International Journal of Production Research. 2018, 56(3-4): 1017-1029. [10] Zhang Peng, Zhao Xinming, Sheng Xia, et al. An Imperialist Competitive Algorithm Incorporating Remaining Cycle Time Prediction for Photolithography Machines Scheduling[J]. IEEE Access. 2018, 6(1): 66787-66797. [13] 张洁,张朋,刘国宝;基于两阶段蚁群算法的带非等效并行机的作业车间调度.机械工程学报,2013,49(06):136-144. |